Bedford NY Road Repaving – Traffic Advisory for Route 172 | Bedford Realtor

Traffic Advisory: The New York State Department of Transportation (NYSDOT) has informed the Town they will be paving Route 172 from Route 117 to Route 22, and Route 22 from Middle Patent Road in Armonk to the intersection of Route 121. This work will be performed by NYSDOT and their contractor, and is not administered or controlled by the Town of Bedford.

The work started during the week of June 25th. The NYSDOT contractor, Grace Industries, will be doing preparation work for paving between 9AM and 4PM for the first two weeks. Residents should expect delays since lanes will be closed as needed. Roads will remain open, but may have single lane traffic. 

Starting the week of July 9, for two to three weeks night paving will occur from Sunday to Thursday 9PM to 6AM. Roads will remain open, but lanes will be closed and single lane traffic will exist. People should expect delays. 

The exact schedule depends on weather and other factors. Residents can contact the NYSDOT field office at 914-722-6512 with any questions or concerns.

Click the link below and then on applicable meeting heading, to view meeting agenda and backup materials for the following meetings:
http://www.bedfordny.info/html/meetings.html
6/25 Planning Board
7/2 Wetlands Control Commission
7/3 Town Board

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.